Series LC/LCE™

Products » Commercial Boilers » Series LC/LCE™

The LC/LCE™ is available with outputs to 3,777 MBH. This advanced boiler design includes integral cast iron flue collector, unique Flex-Seal gaskets and individual draw rods. Boiler efficiencies are compliant with federal and ASHRAE 90.1 requirements. The top and front cleanouts allow for easy cleaning ensuring highest operating efficiency. The pressurized, forced draft firing requires only a three foot vent above the roof. The LC™ has cast iron rear outlet with integral damper that can be adjusted and locked in position. The LCE™ has cast iron top outlet with butterfly flue damper that can be mounted horizontally or vertically.

Type: Commercial
Construction: Cast Iron
Fuel: Oil, Gas, Gas/Oil-Fired
Input: 686 to 4,663 MBH
Output: 547 to 3,777 MBH
Venting: Forced Draft
Trim: Water or Steam
Combustion: Power Burner

 

  • Large Commercial
  • Packaged Assembled Block or Individual Sections
  • Forced Draft Venting
  • Power Burner — Oil, Gas, Gas/Oil
  • Steam or Hot Water Boilers
  • Optional Tankless Coils

Don't see the information you need? See the "Related Documents" tab for product resource downloads.

  •  
Series LC/LCE™ Water Content
Model Number Oil Input Gas Input, MBH Net Ratings4 Oil Gas Steam, Gal Water, Gal
GPH MBH Steam, sqft Steam3, MBH Water2, MBH Combustion Efficiency5, % Thermal Efficiency5, % Combustion Efficiency5, % Thermal Efficiency5, %
LC-04 4.75 665 686 1,708 410 476 83.7 82.2 81.2 79.8 40.57 50.65
LC-05R 5.60 784 808 2,029 487 564 83.7 82.8 81.2 80.3 47.29 59.05
LC-05 6.10 854 881 2,208 530 615 83.7 82.8 81.2 80.3 47.29 59.05
LC-06 7.50 1,050 1,077 2,713 651 755 83.7 83.1 81.1 80.6 54.01 67.45
LC-07 8.80 1,232 1,273 3,217 772 895 83.6 83.3 81.1 80.8 60.73 75.85
LC-08 10.20 1,428 1,469 3,717 892 1,034 83.6 83.5 81.1 81.0 67.45 84.25
LC-09 11.60 1,624 1,664 4,250 1,020 1,174 83.6 83.6 81.1 81.1 74.17 91.65
LC-10 12.80 1,792 1,860 4,804 1,153 1,314 83.6 83.7 81.1 81.2 80.89 101.05
LC-11 14.20 1,988 2,056 5,367 1,288 1,454 83.6 83.8 81.1 81.3 87.61 109.45
LC-12 15.60 2,184 2,252 5,917 1,420 1,593 83.6 83.9 81.1 81.4 94.33 117.85
LCE-13 17.00 2,380 2,464 6,358 1,526 1,710 83.5 82.2 81.0 79.8 101.05 126.25
LCE-14 18.40 2,576 2,657 6,875 1,650 1,848 83.5 82.5 81.0 80.0 107.77 134.65
LCE-15 19.80 2,772 2,850 7,388 1,773 1,986 83.5 82.6 81.0 80.2 114.49 143.05
LCE-16 21.00 2,940 3,043 7,908 1,898 2,125 83.5 82.8 81.0 80.3 121.21 151.45
LCE-17 22.50 3,150 3,236 8,421 2,021 2,263 83.5 82.9 81.0 80.4 127.93 159.85
LCE-18 24.00 3,360 3,429 8,938 2,145 2,403 83.5 83.1 81.0 80.6 134.65 168.25
LCE-19 25.00 3,500 3,622 9,454 2,269 2,541 83.5 83.2 81.0 80.7 141.37 176.65
LCE-20 26.50 3,710 3,815 9,971 2,393 2,680 83.5 83.3 81.0 80.8 148.09 185.05
LCE-21 28.00 3,920 4,027 10,533 2,528 2,831 83.6 83.3 81.1 80.8 154.81 193.45
LCE-22 29.50 4,130 4,239 11,096 2,663 2,983 83.6 83.4 81.1 80.9 161.53 201.85
LCE-23 31.00 4,340 4,451 11,658 2,798 3,134 83.7 83.5 81.2 81.0 168.25 210.25
LCE-24 32.50 4,550 4,663 12,217 2,932 3,284 83.7 83.5 81.2 81.0 174.97 218.65

1 Burner input based on No. 2 fuel oil with a heating value of 140,000 Btu per gallon.

2 Net water ratings based on allowance of 1.15.

3 Net steam ratings based on an allowance for LC-04 to LC-08=1.333, LC-09=1.323, LC-10=1.310, LC-11=1.298, LC-12=1.290, LCE-13 to LCE-24=1.288.extensive piping systems, etc.

4 Consult factory before selecting a boiler for installation having unusual piping and pickup requirements, such as intermittent system operation, extensive piping systems, etc.

5 Combustion and thermal efficiency determined in accordance with The Hydronics Institute’s Testing and Rating Standard for Heating Boilers.

Don't see the information you need? See the "Related Documents" tab for product resource downloads.

Boiler Model Number Jacket Length"A" Flue Size"B" Distance Between Tappings*
"C" "C1"
LC-04 25 15/16" 9" 16 1/2" --
LC-05R 31" 9" 21 9/16" --
LC-05 31" 9" 21 9/16" --
LC-06 36 1/16" 10" 26 5/8" --
LC-07 41 1/8" 10" 31 11/16" --
LC-08 46 5/16" 10" 36 13/16" 15 13/16"
LC-09 51 3/8" 12" 41 7/8" 20 15/16"
LC-10 56 7/16" 12" 46 15/16" 20 15/16"
LC-11 61 1/2" 12" 52" 26"
LC-12 66 9/16" 12" 57 1/8" 26"

Apply Prefix"O" for oil—"G" for gas—"GO" for gas-oil.

The manufacturer should be consulted before selecting a boiler for installations having unusual piping and pickup requirements, such as intermittent system operation,
extensive piping, etc. For forced hot water heating systems where the boiler and all the piping are within the area to be heated, the boiler may be selected on the
basis of its Gross Output.

* Dimensions are approximate.


Boiler Model Number Jacket Left of Jacket to C/L of Flue"D" Front of Jacket to C/L of Flue"E" Flue Size"F" Distance Between Tappings*
Width"A" Length"B" Top to Floor"C" "G" Water Steam
"G1" "G2" "G1" "G2" "G3" "G4"
LCE-13 37" 71 3/4" 63" 16" 20 1/2" 14" 62 3/16" 36 3/16" -- 36 3/16" -- -- --
LCE-14 37" 76 13/16" 63" 16" 20 1/2" 14" 67 1/4" 41 1/4" -- 20 15/16" 20 5/16" -- --
LCE-15 37" 81 7/8" 63" 16" 20 1/2" 14" 72 5/16" 46 3/8" -- 26" 20 5/16" -- --
LCE-16 37" 86 15/16" 63" 16" 20 1/2" 14" 77 7/16" 51 7/16" -- 26" 25 7/16" -- --
LCE-17 37" 92 1/8" 63" 16" 20 1/2" 14" 82 1/2" 41 1/4" -- 20 15/16" 20 5/16" 15 1/4" --
LCE-18 37" 97 3/16" 63" 16" 20 1/2" 16" 87 9/16" 41 1/4" -- 20 15/16" 20 5/16" 20 5/16" --
LCE-19 37" 102 1/4" 63" 16" 20 1/2" 16" 92 5/8" 41 1/4" -- 20 15/16" 20 5/16" 25 7/16" --
LCE-20 37" 107 7/16" 63" 16" 20 1/2" 16" 97 3/4" 41 1/4" -- 20 15/16" 20 5/16" 15 1/4" 15 1/4"
LCE-21 37" 112 1/2" 63" 16" 20 1/2" 16" 102 13/16" 41 1/4" 35 9/16" 20 15/16" 20 5/16" 20 5/16" 15 1/4"
LCE-22 37" 117 9/16" 63" 16" 20 1/2" 16" 107 7/8" 41 1/4" 40 5/8" 20 15/16" 20 5/16" 20 5/16" 20 5/16"
LCE-23 37" 122 5/8" 63" 16" 20 1/2" 16" 112 15/16" 46 3/8" 40 5/8" 26" 20 5/16" 20 5/16" 20 5/16"
LCE-24 37" 127 11/16" 63" 16" 20 1/2" 16" 118 1/16" 46 3/8" 45 11/16" 26" 20 5/16" 20 5/16" 26

Apply Prefix"O" for oil—"G" for gas—"GO" for gas-oil.

The manufacturer should be consulted before selecting a boiler for installations having unusual piping and pickup requirements, such as intermittent system operation,
extensive piping, etc. For forced hot water heating systems where the boiler and all the piping are within the area to be heated, the boiler may be selected on the
basis of its Gross Output.

* Dimensions are approximate.

Don't see the information you need? See the "Related Documents" tab for product resource downloads.